3D Rendering Of The Swimming Pool
ZEF has been appointed building services engineers for the 50 metre olympic swimming pool in Crystal Palace Park.

The pool will be relocatable as it will to move to another site in 2014.

The brief asks ZEF to develop a very low energy design. The design will include CHP, heat pumps, heat recovery systems, all integrated with underground air and water sources.